3rd Floor St. Mary’s Hospital, Portsmouth

3rd Floor St. Mary’s Hospital, Portsmouth
  • Fit-out of, previously fallow, third floor area within Block A, St Mary’s Hospital, for conversion to Community Mental Health Team (CMHT) offices and interview rooms
  • Careful consideration given to provide the correct door access requirements to ensure staff safety at all times
  • Featured low surface temperature (LST) perimeter heating
  • Internal rooms fitted with heating coils within the supply air system to maximise available wall space
  • Bespoke dwarf partition designed, in conjunction with the architect, to avoid exposed containment and eliminate the risk of multiple extension leads where desks protrude into open office space
Skills

Posted on

April 11, 2016